MAIN CONTRAC : EN CON’S BUILT CO., LTD.
INSTALLATION (PRESENT)
29.1 WAST WATER SYSTEM WATER SUPPLY SYSTYEM
29.2 EXHAUST SYSTEM AIR CONDITION SYSTEM
29.3 LOW VOLTAGE SECTION,GROUND SYSTEM
29.4 LIGHTING OUTLET SYSTEM,FIRE ALARM,LIGHTNING PROTECTION
29.5 CCTV INTERNET SYSTEM
29.6 FIRE HOSE CABINET SYSTEM
Menu